Forward entry for a front mount. Its all about the volume mostly. You can see how the entry pipe is against the back wall. It also has 300+mm from entry point with no restrictions (so no directional changes or wall). You need a minimum of 50mm all the way across. dont worry about tapering ends off etc just get the height for the volume. Centre entry should also follow the back wall.




Reply With Quote
