Sounds like it but it really isn't, if you have the tools to grind it down the whole job should take an hour including the wiring
Sounds like it but it really isn't, if you have the tools to grind it down the whole job should take an hour including the wiring
1990 Ford Maverick, 4.2 Carby, 2" SL, 2" BL, Dual Batts, 33" Maxxis Big Horns
patch697 (15th September 2012)