Entry 3
I went to Vegas a few years back for a work conference and while I was there I had to drive this around a race track as fast as I could go for 5 laps.
The things we have to do for work.
IMG_0537.JPG
Entry 3
I went to Vegas a few years back for a work conference and while I was there I had to drive this around a race track as fast as I could go for 5 laps.
The things we have to do for work.
IMG_0537.JPG
Avo (30th April 2018), MB (26th April 2018), Yeti's Beast (18th April 2018)
lucky number 3...this is my work,what I love,where I live and were I feel at home...even if i'm paid to be here
shot sorry..did not take this....(disclaimer)-----was done from someone for an add for Australia's south west add compaign my kids did and I got sent photo's.
Last edited by Avo; 23rd April 2018 at 10:24 PM.
Watch this space, as there maybe a comment added soon
Absolutely truly beautiful Avo mate, Lucky Duck ;-)
Sent from my iPhone using Tapatalk
GQtdauto (24th April 2018)
Marriage Celebrant ;-) !
Sent from my iPhone using Tapatalk
GQtdauto (24th April 2018)
Looks very good looking country and water storage there Avo. Excellent remnant vegetation out the back.
2008 GU WAG ST Manual CRD - To do the job
Safety Goon in tier 1 construction
![]()
IF YA DONT GET STUCK YA AINT TRYIN HARD ENOUGH........OR YA TOOK THE CHICKEN TRACK![]()
WARNING: TOWBALLS USED WITH SNATCHSTRAPS DO KILL!!
IF YA DONT GET STUCK YA AINT TRYIN HARD ENOUGH........OR YA TOOK THE CHICKEN TRACK![]()
WARNING: TOWBALLS USED WITH SNATCHSTRAPS DO KILL!!
katwoman (25th April 2018)
IF YA DONT GET STUCK YA AINT TRYIN HARD ENOUGH........OR YA TOOK THE CHICKEN TRACK![]()
WARNING: TOWBALLS USED WITH SNATCHSTRAPS DO KILL!!
Avo (24th April 2018)
Only a few days to get your entries in for this months comp, it will be closed for new entries around 8PM Sunday 29th and voting will close 8PM Monday 30th.
Stoney Creek Picture1.png
This Rail Bridge was built 1920 with a 100 year Design Life. Pier 1 began to subside in 1983 and the ballast has been regulated over and over again for the last 34 years.
The Pier 1 had subsided 75mm. The ARTC came to Mainmark looking for a solution which would present an extension of the design life for another 20 years.
The Subsidence was causing impact force to one end of the pier far beyond the design load and resupport and lift was required.
I designed the final solution and then Project Managed the delivery on site for Deep Resin Injection Underpinning of the pier footing.
Mainmark mobilized 2 Operations Units and working within a single 12 hour Track Occupation was able to deliver a 74mm Lift of the Bridge and Train for the Best possible result.
The Train was parked on top of the pier to present maximum Over burden for the best possible compaction of ground.
Its a Nissan! =====> Its a Keeper!! ....... Got a TD42 in it BONUS!!....... I'm a lucky bugger! I've got 2 of em!
Check out my Toy --> MudRunnerTD's GQ From the Ground Up
The only good thing about an 80 series is..... the front end?? Wrong!!, the Engine?? Wrong!! the Full Time 4WD system?? Wrong!! Its the NissanPatrol.com.au stubby holder fitted over the transfer lever.
WARNING: Towballs used for recoveries can, and do kill people and damage property.