its been a while! builds going slow but still going, missing a few key things and ill be in action. have to wire up the lpg system as its never been on gas before this, run water and oil lines for turbos ans water for converter, coolers all plumbed up, have to build air box and 4inch snorkel,but not needed to kick it over, and ignition still has to be changed, little fiddly stuff takes the longest!