Welcome to the Nissan Patrol forum. To post a question and to see less adds on the forum then you will have to register
first. We are an easy going friendly forum so join in the conversations and feel free to ask any questions.
Become a forum sponsor for only $20 and see no adds with faster page loading times and many extras benefits.
Getting closer, inch by inch. Ran the big wire down to the back today, sheathed it in 3/4" heater hose for mechanical protection, spent a good 2 hrs resolving a potential hot spot where Brunswick have shoe horned the chev into the engine bay, but close to the brake line. Sheathed the brake line in 1100 degC super insulation, then installed 4 layers of high temp fibregalss aluminised matting over that, and installed some spacer blocks under the interchiller lines to create an air gap where the EGT probe - also insulated in the 1100 degC sheath, passes under it.
The details take the time.
Piped up the hydraulic cooler yesterday and let the sealant 24hrs to cure, ran it up and no leaks. the cooler hold a full half volume of the tank which was a surprise, so next job is to top the hydraulic reservoir up, out with the tailshaft - nothing like great access on this build. Resealed the services box under the tray, all ready to pick the pod up from @MB on Wednesday and bring it home. (waiting for the wife to go out then transfer a layer of storage to her side of the garage so the new truck with canopy will fit, working on a whole new level of sneaky!)
Omce home there is maybe another 60hrs of electrical and final fit out to complete the pod. Heading back to the mine at the end of next week for two weeks, so program gets a break.