Nice idea, I'll think about that one
$650 later with all fluids dropped and replaced including fuel filter and air filter. Says its a great rig and no issues with it.
Still working on the rear drawers. All cut, will be picking up my 90kg sliders tomorrow and putting it together. Dummy up all the holes and fit the sliders prior to carpeting it incase it needs some modifications.
Will post pictures soon
So far with the ply, sliders and carpet I've spent $300. Still deciding on what locks to use. I saved money by not using marine ply but 16mm ply for most of the construction and 20mm ply for the fridge slide. The drawer slides are not lockable (Lockable ones are about $3-400 as per the other lads build). I thought well its not likely to get 'too wet' even if I go through rivers eventually (I hope). Time will tell!
Total build cost should be well under $400.