Originally Posted by
PeeBee
Hodgey, yes needed to get the reach into the centre of the building, had transformers on the ground that we could not lift over without shutting them down, so went with a lift plan for the extended fly and the crane guys were fantastic as usual, spectacular in fact. I was on the roof with the doggie and when the load stopped, it was 'bouncing about 25mm - just nice and slow but understandable that the spring was there. Luckily wind was circa 3klm/hr and at first light, removed the old coil and slotted the new one in.