Anyone done this?
I’m going to remove the tiles in our entrance, because its stuck in the 70's, like the rest of the house lol. But the concrete underneath is lower than the adjoining room by about 50mm. So I need to level it up. I worked out the area will require about half a cubic metre of concrete.
Will this be the best option or should I be doing it another way?
Once it level I will be laying a timber floating floor over this area and into the adjoining room. Then plastering the walls.