Forward entry for a front mount. Its all about the volume mostly. You can see how the entry pipe is against the back wall. It also has 300+mm from entry point with no restrictions (so no directional changes or wall). You need a minimum of 50mm all the way across. dont worry about tapering ends off etc just get the height for the volume. Centre entry should also follow the back wall.