OUR VIDEOS GALLERY MEMBER SPONSORSHIP VENDOR SPONSORSHIP

User Tag List

Results 1 to 10 of 690

Thread: Jay see 1997 GU build up

Threaded View

  1. #11
    Smart like tractor Ben-e-boy's Avatar
    Join Date
    Dec 2010
    Posts
    4,440
    Thanks
    735
    Thanked 4,041 Times in 1,746 Posts
    Mentioned
    22 Post(s)
    Tagged
    0 Thread(s)
    Quote Originally Posted by PeeBee View Post
    I am sure they will trip at a point well before the insulation is compromised is perhaps the message. They are a cheap generic design and I have them in use and they certainly have worked for me when i have replicated the short circuit fault.
    No, the message is get the breaker to trip instantly in the event of a fault, dont give it a chance to wait around and trip whenever, hoping it doesn't damage other stuff. That just increases the chance of it not working and damaging other stuff.
    General overloading on the other hand needs a bit of room to move.

    How did you replicate the short circuit fault?
    96 GQ coil/Cab
    08 G6eT


  2. The Following User Says Thank You to Ben-e-boy For This Useful Post:

    jay see (15th December 2019)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •