Bit of an update on my post from 4/8 #10346
Got my caravan out in the nick of time, they bulldozed a metre high mound of topsoil three metres behind my back fence. Promptly cut down about six gums, two of which were dead (I was waiting for them to fall over and collect the wood). They had all the necessary paperwork, it's a safety issue. I was hoping they would leave the wood for me but no they loaded it into the truck. The contractors are fine, great to talk to and just doing their job, it's Vicroads and the local council.
Monday they had a bit of an issue, rolled a compactor and that stopped work for the day. Luckily no injuries, but a very expensive day for them. Cranes, trucks, workcover etc. They then had to shutdown due to the weather.
http://www.nissanpatrol.com.au/forum...017/08/136.jpg